New Build Project
This project started with the demolition of the existing property and site clearance.
Over site was then reduce and a 1.200mm wide foundation formed, this was due to the ground conditions.
Once the foundations were constructed the block and beam floor was installed.
This project is still ongoing, our next visit to site will be to install the drainage system and services.
Building
Before & After
Take a look at the construction...
The Job
Interested?